• 527 days Will The ECB Continue To Hike Rates?
  • 527 days Forbes: Aramco Remains Largest Company In The Middle East
  • 529 days Caltech Scientists Succesfully Beam Back Solar Power From Space
  • 929 days Could Crypto Overtake Traditional Investment?
  • 934 days Americans Still Quitting Jobs At Record Pace
  • 936 days FinTech Startups Tapping VC Money for ‘Immigrant Banking’
  • 939 days Is The Dollar Too Strong?
  • 939 days Big Tech Disappoints Investors on Earnings Calls
  • 940 days Fear And Celebration On Twitter as Musk Takes The Reins
  • 942 days China Is Quietly Trying To Distance Itself From Russia
  • 942 days Tech and Internet Giants’ Earnings In Focus After Netflix’s Stinker
  • 946 days Crypto Investors Won Big In 2021
  • 946 days The ‘Metaverse’ Economy Could be Worth $13 Trillion By 2030
  • 947 days Food Prices Are Skyrocketing As Putin’s War Persists
  • 949 days Pentagon Resignations Illustrate Our ‘Commercial’ Defense Dilemma
  • 950 days US Banks Shrug off Nearly $15 Billion In Russian Write-Offs
  • 953 days Cannabis Stocks in Holding Pattern Despite Positive Momentum
  • 954 days Is Musk A Bastion Of Free Speech Or Will His Absolutist Stance Backfire?
  • 954 days Two ETFs That Could Hedge Against Extreme Market Volatility
  • 956 days Are NFTs About To Take Over Gaming?
  1. Home
  2. Markets
  3. Other

7/16 is the Next Major Time and Cycle Cluster CIT Swing High

In my last public post, I was looking for a 6/30 swing Low.

From my 6/30 Daily Email: "We are Lower into 6/30 T&C cluster Low, at the 6/29 and 7/1 Geometric CIT and at the 13 and 19 TD cycle Lows. From here we rally into a 7/6 High at the 7/5 weekend Solar CIT"

Actual: We made a 6/30 Low and rallied into 7/2 High, 1 Trading day before the 7/5 High and we then declined into 7/7 marginally Lower Lows.


Larger Image


7/16 is the next major Time and Cycle Cluster CIT

Time CIT:
1. 7/16 Solar +/-1
2. 7/15 Geometric CIT


Larger Image

3. Time Squares from 7/08/09 major Low
a. +1512 CD = 08/28/13L+0. 1512 CD = 38.88^2 + 2 = 40.89^2 = 1672 CD
b. +1672 CD = 02/04/14L+1. 1672 CD = 40.89^2 + 2 = 42.89^2 = 1840 CD
c. + 1840 CD = 07/22/14H+2. 1840 CD = 42.89^2 + 2 = 44.89^2 = 2015 CD
d. + 2015 CD = 01/13/15L+2. 2015 CD = 44.89^2 + 2 = 46.89^2 = 2199 CD
e. + 2199 CD = 07/16/15H+/-2


Cycle CIT

1. 7/16: The 7 yr cycle is the 1800 TD Cycle: 05/19/08H + 1801 TD = 7/16/15H+/-
2. 66 wk Cycle or 460 CD cycle: 07/01/10L-460-10/04/11L-454-12/31/12L-466-= 4/11/14L- 461- 7/16/15H+/-
3. Peter Eliades 784/112wk Cycle:
(784 CD X 4 = 3136 =close to 3141 Armstrong Cycle)
start from 9/3/29, recent examples:
a. 38 X 784 = 4/03/11L
b. 39 X 784= 5/22/13H
c. 40 X 784 = 7/14/15H major +/-
4. Bradley 7/16
5. 4/16 SP Cycle is due on 7/15.

What's Next: We have rallied strongly in Option expiration week into the 7/16 major Time and Cycle Cluster CIT, and close to the key 2130-35 SPX resistance, suggesting a swing High forming, before we start the next sharp decline. As all trends are Up, we need a clear reversal lower to confirm.

 

Back to homepage

Leave a comment

Leave a comment